| There is nothing worse than having a great luxury | | | | Use reinforcement material crosslaid to seal the |
| wet room that ends up leaking and causing | | | | floor drain. Brush one sheet on the floor with |
| dampness. The following guide is how the | | | | kerafiber then brush the other one crosswise |
| professionals tank a wet room. And tank to you | | | | onto the first one brush well with kerafiber as |
| and me is waterproof. | | | | well. |
| Walls | | | | Apply kerafiber around the floor drain (40x40cm) |
| Start by applying a primer called keraprimer on a | | | | and turn the double reinforcing sheet onto the |
| clean dry surface i.e. plaster board. Dilute primer | | | | drain. Apply a coat of kerafiber on the entire area |
| 1:1 with water and let it dry for at least 1 hour | | | | and let dry for at least 2 hours, (kerafiber |
| before waterproofing with a latex/fibreglass | | | | changes colour as it dries). |
| material called kerafibre. | | | | Apply a second coat of kerafiber and let dry for |
| Stir the kerafibre well before use and use | | | | 6-12 hours before tiling. Check the thickness of |
| reinforced material in corners, junctions and over | | | | the coat and apply extra kerafiber on thin or |
| screw heads, brush kerafiber over the tape and | | | | porous spots. Allow to dry. The amount of |
| make sure it is thoroughly wet. On pipe inlets use | | | | kerafiber is 0.8 1/m2 and min and the coat |
| reinforcement tape (cut out hole) press the patch | | | | thickness should be 0.5mm. |
| in fresh kerafiber and brush kerafiber over to | | | | Once it is dry cut out hole for floor drain. Make |
| ensure it is wet. Apply the first coat of kerafiber | | | | sure the diameter of hole is at least 40mm |
| on the entire wall area then let it dry for at least | | | | shorter than the diameter of the drain. This |
| 4 hours before applying the second coat. | | | | ensures the brim of the hole reaches the seal of |
| Kerafiber changes to a darker colour when dry. | | | | the floor drain. The kerafiber coat must be at |
| Apply the second coat of kerafiber and let it dry | | | | least 1.5mm thick around the drain. |
| for 6-12 hours before tiling. Check the thickness | | | | Press a compatible tension ring carefully to the |
| of the coat and apply extra kerafiber on thin or | | | | floor drain and cut off any extra membrane from |
| porous spots then allow to dry again. The amount | | | | under the tension ring. Brush kerafiber over the |
| of kerafiber required min. 0.6 1/m2 and min.coat | | | | entire floor area, up to the tension ring seal |
| thickness o.4 mm. | | | | tension ring/drain junction with silicone. |
| Start tilling from the second lowest row of tiles, | | | | Fix the tiles on the floor with superfix tile |
| and at least 10cm from the floor. Fix the tiles on | | | | adhesive. Fill the joints with tile adhesive wait |
| the wall with superfix tile adhesive. | | | | 15-30 minutes and wash excess grout off tiles |
| Floors | | | | with a sponge. Wring the sponge well as excess |
| Apply keraprimer on a clean dry surface; dilute | | | | water can discolour the joints. |
| the primer 1:1 with water. Use reinforcement tape | | | | Clean off excess grout and use silicone on all |
| at corners, junctions and over screw heads brush | | | | seams and corners. Leave for 24 hours to dry |
| kerafiber over the tape and make sure it is | | | | completely. Floor heating can be used gradually |
| thoroughly wet. | | | | after a week from the joint sealing. |